Laserfiche WebLink
INSPECTION REPORT - SECTION 16 FILL <br />TSE FOLLOWING ITEMS ARE TO INSPECTED AND REPORTED AS NOTED: <br />1) Has any significa change been noted in the survey monuments <br />on the Fill? ~ No Yes <br />If yes, explain: <br />Date of Survey: f07~~ <br />Reviewed by: <br />2) Has any significant change been noted in the water level in <br />the water monitoring wells in the Fill? ~ <br />~_ No Yes Measured Level Q. U <br />If yes, explain: <br />Date of Inspection: ~~ - ~ ~' - g / <br />Inspected by: .~ ~ <br />3) Has there been any evidence of Surficial Slope Failure on the <br />' face of the Fill? ~_ No Yes <br />If yes, explain: <br />Date of Inspection: ~/ ce.+*\~ ~`j ~°%y <br />Inspected by: _~ - .~`' <br />4) Has there been an formation of springs or seeps on the face <br />of the Fill? ~ No Yes <br />If yes, explain: <br />Date of Inspection: ~/ec.c~-lam i~ ~°~y <br />Inspected by: _~.~ ~~ ~ <br />Signed: <br />P.E 25436 <br />Date : ,~,~c...~~~ 3.~~1 `t`: ~1 <br />