My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP02857
DRMS
>
Back File Migration
>
Report
>
REP02857
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:33:44 PM
Creation date
11/26/2007 10:22:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Report
Doc Date
2/19/2004
Doc Name
2nd Half 2003 Subsidence Review Memo
From
TAK
To
File
Permit Index Doc Type
Subsidence Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Review Checklist for Subsidence Monitoring Report <br />Mine: Foidel Creek Date this review was completed: 2/19/04 <br />Permit No.: C-82-056 CDMG reviewer: Tom Kald¢nbach <br />Report period: 2nd half 2003 <br />Panel(s) mined during report period: 15 Right <br />Monitoring requirement Regulation citation In compliance: <br />Yes / no . Comment <br />Installed and surveyed <br />monuments prior to 2.05.6(6)(c)(i)(A) Yes <br />underminin . <br /> Total surface strain is determined <br />Located monuments to by locating monuments at <br />detect vertical <br />2.05.6(6)(c)(i)(B) <br />Yes expected points of minimum <br />subsidence and strain (over gateroads) and <br />horizontal displacement. maximum strain (over mid- <br /> anel). <br />Monitored each <br />structure's orientation, 2.05.6(6)(c)(i)(C) Yes <br />location, elevation. <br />Monitored each <br />monument and structure 2.05.6(6)(c)(i)(D) Yes <br />at least uarterly. <br /> Monitoring data on file at mine <br />Commenced monitoring office indicate timely pre-mining <br />of each monument and monitoring. The only renewable <br />structure at least one 2.05.6(6)(c}(i)(D) Yes resource lands or structures <br />month prior to undermined during the reporting <br />undermining. period were Fish Creek and the <br /> UPRR. <br />Submitted monitoring 2.05.6(6)(c)(i)(E) Yes <br />report semiannually. <br />Conducted sufficient <br />post-mining monitoring 2.05.6(6(c)(i))(F) Yes <br />to verify subsidence <br />rediction <br />Accurately predicted 2.05.6(6)(d)(i) Yes In compliance based on <br />subsidence. observations below. <br />There was no imminent <br />or actual material <br />damage or diminution of <br />2.05.6(6)(d)(i) <br />Yes In compliance based on <br />use of renewable observations below. <br />resource lands or <br />structures <br />
The URL can be used to link to this page
Your browser does not support the video tag.