Laserfiche WebLink
the highwall, and it appears that the asphalt plant highwall is stable under <br />' the current conditions (Photo 8). <br />In addition to the inspection of the highwall, observations along the access <br />road to the upper asphalt plant facilities were also made with no surface <br />' cracks or settlement noted. The road is aligned perpendicular to the strike <br />of the nearly vertical bedded sedimentary rock, which is a favorable <br />' orientation for slope stability along the access road. <br />-14- <br />