Laserfiche WebLink
Rajah 30 Annual Report <br />November 2003 <br />No mining or surface reclamation occurred at the site during the past year. <br />In cooperation with the DMG, a bulkhead is being constructed in the R30 adit, and construction is <br />expected to be completed by year-end 2003. <br />No new disturbances are expected during 2004, as the site is inactive. Final reclamation construction <br />is scheduled for 2004, and Umetco will continue to monitor the site. Surface and repairs will be made <br />as necessazy. A DMG approved bulkhead monitoring plan will also be implemented during the 2004. <br />A map is not included because there were no new disturbances during the past yeaz. <br />