My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP02623
DRMS
>
Back File Migration
>
Report
>
REP02623
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:33:23 PM
Creation date
11/26/2007 10:17:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
Report
Doc Date
4/3/2003
Doc Name
1st Quarter 2003 Pond Inspection Report & Coal Mine Waste Pile Inspection Report
From
Oxbow Mining LLC
To
DMG
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.. <br />~ , ~/ ~~~~ <br />~j~~, <br />. .,. __ <br />. <br />FIRST QUARTER 2003 <br />ENGINEERING INSPECTION <br />EAST YARD AND WEST VALLEY FILL <br />GOB DISPOSAL PII,ES <br />The approved Oxbow Mining, LLC (OMLLC) Mine permit document includes a requirement for <br />quarterly inspections of coal mine waste piles for stability. The inspection is to be performed by a <br />registered engineer or other qualified professional specialist, who is experienced in the construction <br />of earth and rockfill embankments. <br />On March 12, 2003, a visual inspection was performed of the East Yazd and West Valley Fill gob <br />disposal areas. The East Yazd gob disposal azea has reached its design capacity, and no new gob <br />material has been placed since June of 2001. The East Yazd pile outslope was seeded with the <br />approved OMLLC seedmix in the Fall of 2003. The seeded slope was inspected for signs of erosion <br />or instability. No erosional features were noted requiring repairs to seeded areas. Nothing was <br />observed during the inspection that would indicate the pile has a potential for structural failure. <br />Safety berms continue to be required by the Mine Safety and Health Administration on the downhill <br />edge of the access ramp. <br />The West Valley Fill has received gob material during the first quarter of2003. Compaction tests <br />are required, as necessary, based upon the amount of material added to the waste area. Compaction <br />tests are planned as material is added to the waste area. <br />The portion of the outslope located between the second bench (approximate 6150 elevation) and the <br />present approximate 6190 elevation of waste material has been graded and covered with at least <br />four feet of suitable, non-toxic and non-combustible soil substitute materials. The second bench has <br />received rough grading with an approximate 2% grade. Nothing was observed during the inspection <br />that would indicate the pile has a potential for failure. <br />Colorado Registered Professional Engineer No. 14726 <br />3737 Hwy 133 P.O. Box 535 Somerset, Colorado 81434 USA <br />TEL (970) 929-5122 FAX (970) 929-5177 <br />_ C~^~A <br />Iltsp cted by James A. Kiger <br />
The URL can be used to link to this page
Your browser does not support the video tag.