My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP02564
DRMS
>
Back File Migration
>
Report
>
REP02564
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:33:20 PM
Creation date
11/26/2007 10:16:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982055
IBM Index Class Name
Report
Doc Date
6/3/2005
Doc Name
1st Qtr 2005 Refuse Pile Report
From
Energy Fuels Mining Company
To
DMG
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QUARTERLY COAL WASTE BANK INSPECTION REPORT <br />CDMR Rules 4.09.1(11) and 4.10.2(2) <br />Mine: Raton Creek <br />Waste Bank MSH, <br />Inspection Period: <br />Inspection Date: <br />No.: Primary Refuse Disposal Area <br />First Quarter 2005 <br />General Description or Reference to Site Plan: <br />Raton Creek Mine is in final reclamation. All required structures have been removed, <br />the area brought to final grade, mulched and seeded. <br />Activity During Inspection (Including General Observations): <br />Area was inactive thoughout the quarter. Vegetation was dormant at the time of inspection <br />as would be expected for fate winter conditions. <br />Drainage: (Discussion of springs. seeps, overland and channel flow, underdrain construction <br />andlor discharge, integrity of 100-yr 24-hr drainage structures, and evidence of positive drainage). <br />No springs or seeps were observed on the refuse side slopes. Positive drainage is established <br />on all areas. Vegetation has been established on reclaimed areas with some tilling on more <br />sparsely vegetated areas. Drainage and diversion structures were operational. <br />Underdrain construction has been completed. <br />Observation of Fiil Construction: (Description of material, compaction, IiR Oricknesses, <br />slopes, and construction methods). <br />Structure has been completed to final grade. No additional material placement is anticipated. <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.