My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP02521
DRMS
>
Back File Migration
>
Report
>
REP02521
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:33:19 PM
Creation date
11/26/2007 10:15:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980080
IBM Index Class Name
Report
Doc Date
7/5/1983
Doc Name
112 ANNUAL FEE LETTER
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' ~ <br />- STATE OF COLORADO <br />DEPC.RTL:EIJT OF HIGHIYL.YS ~~_ <br />°' <br />G ra nO Junction, ('iOloraGO 81502 ~ t` <br />j~a •. <br />(303) 242-2462 Y <br />Una Pit <br />June 23, 1981 <br />CBt~ Builders, Inc. <br />Box 2163 <br />Grand Junction, CO 81502 <br />Attn: t'a rren Gardner <br />Dear t•:r. Gardner: <br />t•:e have received notice from the t•II,R that your request for the transfer <br />and succession of operator on the Una Pit has been approved by the Alined <br />Land Reclamation Board and that CBS4 Builders is now the operator, <br />I would like to in`orm you that at this time the Division of Highways <br />needs approximately 1,000,000 tons of r..aterial for use in the construction <br />of I-70 between Parachute and iJiger Hill_ 1•:e plan to make material from <br />the Una Pit available to our contractors for this work. <br />The Division plans to let the grading contracts on this section in the fall <br />of 1981 and to let the paving contract for the entire section in the fall <br />of 1982. <br />t•:e ~.•ould like to be informed of any operations you plan in the pit so that <br />we can keep our plans up to date and avoid any conflict in the operation <br />of the~pit and use of the haul roads. The approximate area to be excavated <br />for our work will be 25 acres and we will need at least 10 acres for a <br />plant and stockpile site_ <br />If our contractor elects to use t:~e Una Pit, the Division of Highways will <br />want to renew the o?lion we have .n the pit according to additional condition <br />tap. 18_ <br />1f you 'nave any cuestions or if I can be of any help, please let me know. <br />Very truly yours, <br />RGL/cIc R.A. PROS E[JCE <br />DISTRICT EI:GIIJEER <br />cc: L_ Stui~a <br />B. :oston //2 ~ ~ f/ <br />H. '~:otz • <br />Pit file BY ,y ~ -{ ~~ ~ r. ,-i~~ <br />R.G. LUCAS <br />:.,T.RI:-.LS SO'J RCE SrECT~_LIST <br />I:ote: F:ttached is a =_;:etch_ho~.:ing t`,e --pro>:i~iate areas we will reed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.