Laserfiche WebLink
Applegate <br />Group, t~~. <br />Scptcmtxr 14, 2006 R F ~` F ~ ~ /}= D <br />SEP 1 8 2666 <br />Ms. Suzi i:rickscn ,., . _ , . ,.:y <br />Division of Reclamation. ~9ining, turd Safety <br />l.'+13 Sherman Street. Room 21i <br />Denver CO, 8020? <br />RI?: l3ucklen F:yuipment Cumpan},Inc; :lnnual Report fnr Permit \o. ~1-198L131 <br />Dear Ad:. F,rickscn <br />Plrtsc find enclosed a site map and the signed annual report ti,rnt for the Scptentber 20, 2006 <br />Buckler )~:yuipturnt Company Annual Report. :\ check for 5688 is also enclosed to cover the <br />tumual report fee. <br />1"Iris annual report covers the time period from September 21. 2005 to September 20. 2006. <br />\lining activities during the last year have lien confined to a small area on the southeastern side <br />ot'the pit Isee attached map). Previous mining activities have included the northern Ix~rtions of <br />the pit with a dewatcring trench around the perimeter of the excavation. Wining activities during <br />the upcoming year will continue to be in tJtr south and eastern sections of the pit. <br />Reclanation activities have begun. Baektilling and ,loping of the north and ractern pit boundary <br />is in progress (see attached map). the bottom of the pit is currently bring used fi+r processing <br />and stockpiling. As the final configuration of the pit lake is reached, the banks will continue to <br />be rough graded to achicer appropriate slopes. <br />Swi, please call me at (303) 452-661 I if you have any questions or nerd additional information. <br />Sinccrch, <br />Applegate%Group, lnc. <br />1k'illiarnSchrnderlein. P.E. <br />Project l:nginccr <br />\4'KS~ta <br />[incls. <br />cc: A(i Filc CIO-t-ld9 <br />Lori Bucklrn, f3ucklcn Eiquipment Company <br />C flaamtw an! Stq+np,uWuy'L,~ca! $tninp ~revpont) hattfn rrk.OLY.'EV^OR6 Aeiuul Report ferret dot <br />