Laserfiche WebLink
Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-1 I2 <br />June 2003 Monthly Report <br />Page 4 <br />Table 1-June 2003 Ground Water Monitoring Well and Lysimeter Depth to Water <br />Measurements (continued) <br />Monitorin Site Date De th to Water {feet) <br />D8724 6/30/03 58.81 <br />LS-1 6/30/03 D <br />LS-2 6/30/03 D <br />LS-3 6/30/03 D <br />LD-1 6/30/03 D <br />LD-2 6/30/03 D <br />LD-3 6/30/03 D <br />Table 2 -June 2003 Tailing Disposal Area Piezometer Depth to Water <br />Measurements <br />Piezometer Date Depth to <br />Water (feet) Total Depth <br />(ft) Volume of <br />Water (ft) <br />P6 6/28/03 D 72.46 0.00 <br />P7 6/28/03 D 92.50 0.00 <br />P8 6/28/03 96.85 97.51 0.66 <br />P9 6/28/03 71.74 72.30 0.56 <br />P10 6/28/03 57.38 58.30 0.92 <br />Pll 6/28/03 41.16 41.80 0.64 <br />P12 6/28/03 D 41.71 0.00 <br />P13 6/28/03 41.03 41.34 0.31 <br />P14 05/28/03 D 41.24 0.00 <br />P15 05/28/03 D 41.10 0.00 <br />During June 2003, no water treatment plant sludge management was conducted. Table 3 <br />below identifies water treatment plant sludge management for calendar yeaz 2003 to date. <br />Table 3 - Calendaz Yeaz 2003 Water Treatment Plant Sludge Management <br />Date Approximate Tonnage <br />Mana ed Sludge Disposition <br />March 12-15, 2003 670 Tailin Dis osal Area <br />A ril 17-18, 2003 600 D 'n Pad <br />