My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP02384
DRMS
>
Back File Migration
>
Report
>
REP02384
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:33:13 PM
Creation date
11/26/2007 10:13:23 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977140
IBM Index Class Name
Report
Doc Date
2/16/1982
Doc Name
NORTH FARM ROAD PIT 1 FN 77-140
From
MLRD
To
MATHIAS CONCRETE
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hichartl 0 Lamm <br />Gpvernor <br />,, III IIIIIIIIIIIIIIII ~ <br />DEPARTMENT OF NATURAL RESOURCES <br />U AI U~~IC P.utbU Errcul rv~• Dq~~c lnr <br />MINED LAND RECLAMATION DIVISION <br />DAVID C. SHELTON Direclm <br />.• ~ <br />February 16, 1982 <br />Mr. Thomas G. Mathias <br />Vice President, Mathias Concrete, Inc. <br />P. O. Box 266 <br />Monte Vista, Colorado 81149 <br />RE: North Farm Road Pit NI <br />File no. 77-140 <br />Dear Mr. Mathias: <br />Our Division has received your check for $700.00 in payment of your annual fees <br />for the last two years. Therefore, enclosed please find your receipt for this <br />check. We also received your accompanying annual reports for these two years. <br />Z have reviewed these reports and have a few comments. <br />[gill the dredging and/or draglining operations modify the presently approved <br />mining plan in your permit? By this Z mean that if the depth of extraction is <br />increased or the sequence of disturbance to the land within the permit area is <br />changed from what was approved by the Board, then a technical revision to your <br />permit will have to be submitted by you and approved by our Board. The revision <br />should outline the proposed changes to the plan and request Board approval of <br />these changes. This procedure is easily accomplished, requiring no publication, <br />and can usually be heard on the next Board meeting agenda after its submission. <br />Please clarify the situation as concerns these changes to the mining plan. Zf <br />a technical revision to your permit seems to be in order please submit it to <br />our Division before you begin work under the new plan. If you do not feel that <br />such a revision is necessary, please write or call me to substantiate this <br />positiion. Please feel free to call me to answer any questions about this <br />matter. Thank you for your prompt attention to the matter of the annual fees <br />and reports. <br />Sincerely, <br />~ Z Q -^-' <br />~n ~ ~L ~.~~~~ <br />Mark S. Loye <br />Reclamation Specialist <br />Enclosure <br />423 Centennial Building. 1313 Sherman Street Denver. Colorado 80203 Tel. (303) 866-3567 <br />;a. <br />
The URL can be used to link to this page
Your browser does not support the video tag.