My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP02326
DRMS
>
Back File Migration
>
Report
>
REP02326
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:33:08 PM
Creation date
11/26/2007 10:12:49 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985115
IBM Index Class Name
Report
Doc Date
6/5/1990
Doc Name
GREER PIT FN M-85-115 POSSIBLE TEMPORARY CESSATION
From
MLRD
To
J PAT GREER
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />iii iiniiiiniii iii <br />~ STAT~OF COLORADO <br />MINED LAND RECLAMATION DIVISION <br />Department of Natural Resources <br />1313 Sherman St.. Room 216 <br />Denver, CO 80203 <br />303 6663567 <br />Fn x: 303 832-8106 <br />Roy Romer <br />Governor <br />June 5, 1990 <br />Mr. J. Pat Greer <br />8097 Co. Road 100 <br />Hesperous, Colorado 81326 <br />Re: Greer Pit, file No. M-85-115, Possible Temporary Cessation <br />Dear Mr. Greer: <br />OF ~~U<_ <br />..F'.. ~ ; /'. <br />\~ rB76 ~ <br />Fretl R Bama. <br />Dins~on Direolor <br />We have recently reviewed the Greer Pit Annual Report. The report indicates that <br />the site has been, and may continue to be, inactive for at least six months. <br />Please refer to the Minerals Rules and Regulations Sections 1.6.2 and 1.6.2 (2)(a) <br />which state that if an operation ceases production for a period of 180 days or <br />more, the operator must file a Notice of Temporary Cessation with the Board. This <br />notice must state the date of cessation, the reasons for cessation, a plan for the <br />resumption of mining, a description of those activities the operator will take to <br />ensure compliance with the permit reclamation requirements and a description of <br />site maintenance activities to ensure compliance with the performance standards <br />(Rule 6). The Notice of Temporary Cessation should be sent to the Division <br />separate from other correspondence. <br />As an alternative to temporary cessation, you may amend your permit to indicate <br />that the operation will be intermittently active throughout its life. The <br />amendment application must include a description of those activities the operator <br />will undertake to ensure compliance with the permit reclamation requirements, and <br />description of the site maintenance activities which will ensure compliance with <br />the performance standards (Rule 6). Rule 1.6.2.(2)(d) addresses this amendment. <br />Since the annual report indicates that operations have temporarily ceased, you <br />should submit either a request for temporary cessation or a permit amendment within <br />the next 45 days. If the request indicates that the site is sufficiently <br />stabilized, we will approve the request for cessation within sixty days. If the <br />request indicates that there may be some problems with the site, we will either <br />request more information from you, or schedule the site for an inspection. If you <br />submit an amendment to the permit, we will process it within 30 to 90 days for 110 <br />and 112 operations, respectively. <br />If you have questions or comments, please contact me. <br />Sincerely, <br />~~'1C~aG <br />~~12[ ~~~~I1~P <br />Barbara D. Chiappone <br />Annual Fees/Reports Section <br />7739E <br />
The URL can be used to link to this page
Your browser does not support the video tag.