Laserfiche WebLink
<br /> <br />Page 2 <br />8. Installed addition to drainage canal on East side below dam <br />and around cut-off wall. (Z 00 yr. rain storm protection.) <br />9. Reclaimed and or seeded construction area in accordance with <br />U.S. Forest Sezvi~ce.regulat.ions. <br />Sincerely, <br />s1~y~t!' C! ~~~~~~~ <br />Robert A. 8oppe <br />Chief Engineer <br />