Laserfiche WebLink
- z 1 - <br />vations of other slide parts. The figure is probably conservative <br />further studies would be required to verify this estimation. <br />3.5 CONSTRUCTION PROCEDURES <br />It is obvious from the content of this report that the <br />design and the construction of the proposed surface facilities <br />within the landslide area will be difficult. Not all details of <br />the construction and of the recommended drainage can be fully <br />dealt with in the design. It is impossible to obtain all details <br />of geotechnical and ground water conditions prior to the con- <br />struction. Construction procedures will very much depend on the <br />season of the year. <br />We believe that, for these reasons, construction super- <br />vision by an e~:perienced and qualified geotechnical or soils <br />engineer is of importance; many details during the construction <br />will have to be resolved with his assistance. <br /> <br />1 <br />We hope that you will find this report useful for your <br />design and for the construction; we would be happy to assist <br />you in the future with this challenging and interesting project. <br />Denver, November 21, 1980 <br />-.l-e~ 1538 <br />N • .,, <br />i .~ <br />.9>~:~0.,., 6C: <br />GEO-HYDRO CONSULTING, INC. <br />7-c;~c.~1 ~~,.~,.~r~ <br />Michal Bukovansky <br />Senior Engineering Geologist <br /> <br />Graeme Major <br />Project Engineer <br />o,:' <br />a.o-~.o~~.w..K <br />