My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP02075
DRMS
>
Back File Migration
>
Report
>
REP02075
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:32:48 PM
Creation date
11/26/2007 10:09:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
Report
Doc Date
10/17/1994
Doc Name
BEAR COAL CO INC PERMIT C-81-033 SUBSIDENCE REPORT
From
BEAR COAL CO
To
DMG
Permit Index Doc Type
SUBSIDENCE REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENGINEERING & SURVEYING COMPANY <br />.f <br />443 DODGE ST. • DELTA, COLORADO 81416 • 303-874-7593 • FAX 303-874-7570 <br />7881-94 <br />Subsidence <br />October 6, 1994 <br />Bear Coal Company <br />P. O. Box 518 <br />Somerset, Colorado 81434 <br />Attention: Basil Bear <br />Re: Subsidence and Slope <br />Bear Coal Company <br />Bear Mine No. 3 <br />Somerset, Colorado <br />Stability monitoring: <br />UTE ENGINEERING AND SURVEYING COMPANY completed the subsidence <br />and slope stability survey during September, 1994 for the Bear <br />Mine #3. <br />This survey is based on 2 control monuments located across the <br />canyon on the property of the Somerset Mining Company (formerly <br />Kaiser Coal Company), that have been in place for several years. <br />The monuments are referred to as D-11-U and D-12-U. See Map for <br />location. The monuments are 3-inch pipe with a 4-inch plate so <br />the elevation will be fixed for each reading. The coordinates of <br />the monuments are: <br />Northing Fasting Elevation <br />D-11-U 405,065.78 1,440,549.57 6185.92 <br />D-12-U 405,418.32 1,441,625.51 6195.50 <br />These coordinates and elevations will remain fixed and all other <br />points will be relative to them. <br />We have developed a sequence for the surveys that divides the sta- <br />tions into primary control loops and points tied by sideshot <br />only. All stations are 3" diameter steel pipe described in our <br />report dated August 10, 1985 unless noted otherwise. , <br />
The URL can be used to link to this page
Your browser does not support the video tag.