Laserfiche WebLink
Bear Coal Company <br />9 October 6, 1994 <br />In May of 1944 UTE established three (3) new stations in Lone <br />Pine Gulch. See map for location. The values through September, <br />1994 survey are as follows: <br />STATION U25 <br />May, 1994 399,159.59 1,437,782.92 6651.10 <br />July, 1994 399,159.32 1,437,782.73 6651.30 <br />Sept., 1994 399,159.94 1,437,782.54 6651.51 <br />Mean 399,159.62 1,437,782.73 6651.30 <br />STATION U26 <br />May, 1994 399,450.63 1,438,169.59 6908.94 <br />July, 1994 399,450.56 1,438,169.42 6909.04 <br />Sept., 1994 399,450.77 1,438,169.22 6908.93 <br />Mean 399,450.65 1,438,169.41 6908.97 <br />STATION U27 <br />May, 1994 399,785.83 1,438,445.67 7132.25 <br />July, 1994 399,785.85 1,438,445.38 7132.12 <br />Sept., 1994 399,786.05 1,438,445.20 7131.84 <br />Mean 399,785.91 1,438,445.42 7132.07 <br />Slope Stability Stations at Bear #3 Are Tied to D-11-U and D-12-U <br />through a series of primary loops: <br />Bear #3 U 16 <br />U 17 <br />U 18 <br />U 19 4 <br />U 23 5 <br />U 24 6 <br />Table 2 is a list of slope stability Stations with their coor- <br />dinates and elevations from August, 1985, through September, 1994 <br />and the resulting mean values. <br />4 Monument = #5 Rebar <br />5 Monument = #7 Rebar in concrete <br />6 Monument = #6 Rebar in concrete <br />