Laserfiche WebLink
O CP 032 <br /> Qd��G°ZQ G�G°�CU �OoG7�o �Qe 999 ERAL OFFICES AND PLANT <br /> Az SAND AND GRAVEL 11521 BRIGHTON ROAD• HENDERSON.COLORADO 80640 <br /> (303)289-1837 <br /> RECEIVE® <br /> June 24, 1998 JUL 13 1990 <br /> Mr. Carl Mount DiviSionofMineralSSGeoio9y <br /> Division of Minerals and Geology <br /> Minerals Section <br /> 1313 Sherman Street Suite 21 <br /> Denver, Colorado 80203-2273 <br /> Dear Mr. Mount: <br /> Re Albert Frei and Sons, Inc, <br /> Walstrum Mine, M.L.R. Permit <br /> No. M-83-033, Annual Report <br /> FEDERAL TAR ID() 84-0517799 <br /> Our files indicate that the anniversary date for this <br /> permit is June 23. This pit HAS NOT been granted a Temporary <br /> Cessation and it HAS operated more than 180 days this year. The <br /> Financial Warranty for this operation is $75,000, the permitted <br /> area is 125.88 ac. ± and the pit is divided into 7 Reclamation <br /> Phases. A sign that conforms with rule 6.7 Signs and Markers is at the <br /> entrance to the quarry on the scale house. Please refer to the <br /> Annual Report Map for the location of areas discussed in this <br /> report. This is a quarry operation, as a result we remove large <br /> amounts of material without disturbing large areas of land. <br /> We will deal specifically with each of the Annual Report <br /> requirements as outlined in Rule 1. 15 of the Rules and Regulations, <br /> and the annual notice letter. <br /> ( 1) Mining continued on the area previously stripped in Phase I <br /> (green) . Total disturbance to date in Stage I is 29 . 39 acres <br /> ± . The floor area increased by 1.25 acres ± as the face of <br /> the mine moved into the stripped area. The current face area <br /> covers approximately 6.64 acres ± (tan) . The floor of the <br /> mine is on three levels; the first is the level near the <br /> scale; the second is approximately 80 feet higher and the <br /> third is near the face and is another 30 feet above the sec- <br /> ond. The scale house level is the final level of the mine <br /> floor. The other two benches will be lowered as mining pro- <br /> gresses into the property. The upper benches were left to <br /> accommodate the processing equipment so the mine would work <br /> more efficiently. <br /> (2) No reclamation was required this year. Minor amounts of <br /> backfill continue to be placed in the valley on the eastern <br /> side of Phase I as approved (brown) . There is a topsoil <br />