My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP01797
DRMS
>
Back File Migration
>
Report
>
REP01797
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:32:30 PM
Creation date
11/26/2007 10:04:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Report
Doc Date
4/14/1992
Doc Name
MEMO-SAN LUIS PROJECT TAILING IMPOUNDMENT AND COLLECTION POND
From
MLRD
To
LARRY OEHLER
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />F1 <br />Y) <br /> <br />In placing the main embankment liner, the splitter embankment liner, and the <br />lower disposal area liner, work crews experienced difficulty marking the wedge <br />welders perform adequately. A significant percentage of seams were <br />subsequently capped using extrusion welding techniques. The double wedge <br />welding machines periodically melted holes in seams which resulted in a large <br />number of caps and seams that could not be tested continuously by air testing <br />of the channel. Ali repairs on the seams and interior areas of the liner were <br />vacuum tested for water tightness prior to acceptance and placement of the <br />cover material. <br />UNCONTAINED SEEPAGE <br />Calculations of the amount of seepage that will escape the tailings <br />impoundment through the synthetic liner and underlying compacted soils, are <br />based on a number of assumptions. The first assumption being that potential <br />holes in the liner would be .1 square centimeters in size with a frequency of <br />one hole per acre. These values correspond to values from EPA document <br />"Design and construction of RCRA/CERCLA Final Covers" for a liner installation <br />implemented with a high level quality assurance program. The second <br />assumption is that the hydraulic head applied to the liner will be minimized <br />by the subdrainage layer and piping and will be about one foot. With the <br />known values for permeability of the sub-drainage layer, the compacted soils, <br />and the geomembrane, Darcy's Law predicts total uncontained flow from the <br />tailings impoundment to be approximately 15,000 cu. ft./yr. or 112,000 gallons <br />per year. <br />CONCLUSIONS <br />As it is designed, the San Luis Project tailings impoundment seepage rate is <br />low enough `hat it will not induce unsaturated flow in the underlying <br />material, hence any pollutants that seep through the liner would not reach the <br />water table. This conclusion is based on the values for hydraulic <br />conductivity calculated or specified for the subdrainage layer, the <br />geomembrane, the compacted soil layer and the liner foundation, as well as the <br />quality assurance program followed during liner installation, and the design <br />performance of the subdrainage layer in limiting the head applied to the <br />liner. This conclusion is further based on moisture content and specific <br />retention (5X and lOX respectively) values supplied by the operator for the <br />liner foundation subsoils. <br />ACS/yjb <br />2567E <br />-'- <br />
The URL can be used to link to this page
Your browser does not support the video tag.