Additional Page <br />2001 Annual Report <br />Menzer Quarry <br />M-1976-009-HR <br />Schmidt Construction Company <br />Anniversary Date: December 31 <br />Overview of Perntit Year: During the 2001 operating year there was a great deal of activity at this site. <br />This was primarily due to the very active construction market throughout the Colorado Springs area. <br />However, in spite of all the mining done, the quarry changed only a little. This was bec.tuse of the large <br />quantity of material that was available within areas that had previously been prepared for mining. The <br />land on the north side of the affected land which was opened in 1999 was mined to a large extent. <br />Mining on the south side of the operation where mining has been done the last few years has essentially <br />been completed, but mining on the floor of the quarry below that south side is continuing. The <br />completed mining areas on the south side are being prepared for final reclamation. <br />Annual Report Maps: The enclosed color map shows the primary areas of disturbann~ and the type of <br />disturbance occurring in each area. This map is only slightly changed from last year <br />Affected Lands: The amount of affected land increased very little from last year. <br />Revegetation: The site is stable and is not subject to erosion. No revegetation was done in 2001 as no <br />land was available to revegetate. However, the south side benches that have been completed are being <br />prepared for revegetation. <br />Expected Activity (2001): The mining zone (orange on the map) will continue to expand northward <br />into the brown area. An additional zone of stripping into Settion 31 and west of the current operation is <br />shown on the map. This stripping is necessary to efficiently remove the materials in the land previously <br />stripped in the southwestern comer of the affected land. Because the ridge in this come:• forms a unit for <br />mining, the stripping must be done west of this area so mined land is not created immeciiately adjacent <br />to unstripped land. If that condi[ion was created it would be nearly impossible to safely remove <br />vegetation and soils from new mining areas and soil resources would very likely be lost. In the 2000 <br />annual report it was indicated that this land would be stripped in 2001, but that did not occur as <br />expansion in tha[ direction was not necessary. <br />Bonding: This operation is covered by a self bond. During the last year, a bonding pr~~blem discovered <br />by the Division was corrected and a succession of operator was approved to change the operator from <br />Centennial Materials to Schmidt Construction Company. Enclosed is a copy of the mo>t current <br />Divisional Balance Sheet for Schmidt Construction. Schmidt Construction is a subsidiary of Edw. C. <br />Levy Co. <br />Schmidt Construction Company 2001 Annual Report M-76-009-HR Menzer Quarry Page 1 of 1 <br />