Laserfiche WebLink
precipitation events. This will be adequate sediment storage until Pond 608 is completed. <br />In conclusion, Peabody is requesting that sediment surveys for Ponds 002 and 003 be <br />performed on a five-year frequency and that sediment surveys for Pond 004 be conducted on <br />a two-year frequency. <br /> <br /> <br />G-7 <br />