Laserfiche WebLink
1 <br />1 <br />TABLE 28 <br />1 Monthly Monitoring of Springs <br />in the North Part of the Dry Fork Drainage <br /> Spring Flow (gpm) Date <br /> D-2 snow covered 01/10/84 <br /> sonw covered 02/08/84 <br />' snow covered 03/07/84 <br /> 0.2 10/10/84 <br /> 0.2 11/12/84 <br />' snow covered 12/14/84 <br /> G-8a inaccessible 01/10/84 <br />' inaccessable <br />inaccessable 02/08/84 <br />03/06/84 <br /> inaccessable 04/04/84 <br /> inaccessable 05/22/84 <br /> inaccessable 06/08/84 <br />' 8.7 07/11/84 <br /> 5.0 08/08/84 <br />1 4.3 <br />3.8 09/04/84 <br />10/10/84 <br /> inaccessable 11/12/84 <br /> inaccessable 12/14/84 <br />1 <br /> J-4 snow covered 01/10/84 <br /> snow covered 02/08/84 <br /> meltoff interferrance 03/07/84 <br />' meltoff interferrance 04/04/84 <br /> meltoff interferrance 05/22/84 <br /> meltoff interferrance 06/08/84 <br />' 8.5 07/11/84 <br /> 2.6 08/07/84 <br /> 2.3 09/06/84 <br /> 1.4 10/10/84 <br />' 0.7 11 /12 /84 <br /> frozen 12/14/84 <br />' J-6 snow covered 01/10/84 <br /> snow covered 02/08/84 <br /> snow covered 03/06/84 <br /> meltoff interferrance 04/04/84 <br />' meltoff interferrance 05/22/84 <br /> meltoff interferrance 06/08/84 <br /> 7.5 07/11/84 <br />' 3.8 08/07/84 <br /> 2.5 09/06/84 <br />-633- <br />