My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP01431
DRMS
>
Back File Migration
>
Report
>
REP01431
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:31:51 PM
Creation date
11/26/2007 9:57:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Report
Doc Date
5/5/1995
Doc Name
1994 ANNUAL HYDROLOGY REPORT
Annual Report Year
1994
Permit Index Doc Type
HYDROLOGY REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 1.3-1 Summary of the 1994 Spring Monitoring Program at the West Elk Mine <br />• Frequenry of Dischazge Frequenry of blazer <br />Measttrement During Qualiry Meazurement <br />Locazion WY 1994` During WY 1994` <br />Springs above the "F' Seam in the North Forst Drainage Basin <br />Program <br />G-12 3 times <br />G-14 <br />G-16 <br />3 times <br />3 times <br />3 times <br />3 times <br />3 times <br />G-22 3 times 3 times <br />G-24 3 times 3 times <br />G-26B (Old Cabin Spring) monthly monthly <br />Baseline <br />(3) Jumbo Pipeline and Spring No. 5 (formally monthly monthly <br />G-35) <br />(4) Jumbo Spring No. 7 Pond (formally G-36) monthly monthly <br />(5) Wilcox Reservoir No. 1 (formally G-37) monthly monthly <br />(6) Wilcox Reservoir (formally G-38) monthly monthly <br />(7) Section 24 Spring No. 1 Pond (formally G-39) monthly monthly <br />Springs in or below the "F' Seam in the North Fork Drainage Basin <br />Program <br />G-la 3 times 3 times <br />G-20 3 times 3 times <br />• <br />CR-12 montly monthly <br />Baseline <br />(8) Jumbo Spring No. 6 Pond monthly monthly <br />(9) Raymond Wilcox Reservoir No. 2 (formally G~0) monthly monthly <br />((0) Culvert Spring (formally G-41) moodily monthly <br />nd Noah of Jumbo Mountain Spring q2 (formally <br />(IG~ monthly monthly <br />2) <br />(15) Jumbo Spring No. 2 Pond (formally G-25) monthly monthly <br />(16) Farnsworth Pond (formally G~6) monthly monthly <br />(17) G-30 monthly monthly <br />(18) Jumbo Spring No. 4 Pond (formally G-31) monthly monthly <br />(19) Pond N.W. Drill Hole JMB-9 (formally G~7) monthly monthly <br />Each spring monitoring station is scheduled for dischazge and water quality measurements three <br />(seasonal sampling window) ttmes a yeaz.. Field measurements included flow, ppH, conductivity, <br />~emperazure, dissolved oxygen, and turbidrry. Laboratory analyses included pH,specific conductance, <br />total dissolved solids, total suspended solids, iron (total) and manganese (total). 'Ihe springs <br />associated with the Jumbo Motmtain tract (7-26B and CR-12) wer a sampled monthly. In addrtron to <br />these parameters measured for other springs, laboratory analysis included measurements of alkalinity <br />(as CaCO~ brcazbonate (as CaCOt), calcrum (dissolved), carbonaze (as CaCO~, chloride, magnesrum <br />(total), nitrate (as N, dissolved), nitrate/nitrite (as N), nitrite (as N, dissolved), phosphorus (ortho <br />drsso)ved), sodium (dissolved), sulfaze, aluminum (total), arsenic (total), cadmium (total), copper <br />(total), lead (total), mercury (total), molybdenum ([oral), selenium (total), and zinc (total). <br /> <br />RI.210/IOa03/OS/95(B:Oaam) ( REVISED 10/02/96 <br />
The URL can be used to link to this page
Your browser does not support the video tag.