Laserfiche WebLink
TABLE 1 (Continuetl) <br />• HYDROLOGIC MONITORING SITES <br />WATER LEVEL MEASUREMENTS <br />SITE MONITORING FREQUENCY COMMENTS <br />Water Level Only <br />Foidel Creek <br />14 Monthly (1), (2) S (3) <br />8 Monthly (1), (2) & (3) <br />304 Monthly (1),(2) & (3) <br />Fnidcl Creek Alluvium <br />16 Monthly (I),(2) & (3) <br />302 Monthly (During Irrigation) (I) .Q (4) <br />307 Monthly (I), (2) & (3) <br />1002 Monthly (I),(2) & (3) <br />NOTES: <br />C, <br />J <br />(1) Included with Twentymile Coal Company's hydrologic monitoring program. If site is removed from <br />TCC's program and continued monitoring is required, CYCC will monitor site. <br />(2) Monthly measurements for water level collected during ice free months: late March or early April <br />through September. <br />(3) These sites arc also components of surface stream flow monitoring program. <br />(4) First headgate o(irrigalion ditch downstream of mine discharge. Monitoring [o begin once Fish Creek <br />De~vatering Facility is functioning. <br /> <br />CYCC AHR Oz/11 ~9] I95PREADSMAHRICYCC9G~TABLE5.XL5 <br />