Laserfiche WebLink
• RECEIVED <br /> AUG 14 2WO <br /> Division of Minerals and Geology <br /> King Solomon - Dolores Bench Annual Report <br /> Reclamation construction at the King Solomon mine was completed in early 1999 except for the treatment <br /> of petroleum contaminated soils (PCS) at the site. PCS are presently being treated. Umetco is also <br /> monitoring vegetation at the site. Refer to the map titled King Solomon Mine Spoils As-Built Contours for <br /> details. <br /> Reclamation construction at the Cliff Dweller was completed in early 1999. Umetco is presently <br /> monitoring vegetation at the site. Refer to the map Clif/Diveller Mine Spoils As-Built Contours for details. <br /> No construction activity occurred at the site during the past year. <br /> The Ophir Mine was recently released from the permit. <br /> Construction activity planned for next year is reseeding of the top of the King Solomon mine spoils pile <br /> and continued treatment of PCS. Umetco will continue to monitor the sites for stabilization and vegetative <br /> growth in anticipation of permit termination. <br />