Laserfiche WebLink
w <br /> King Solomon - Dolores Bench Annual Report 2000-2001 <br /> Reclamation construction at the King Solomon mines was conducted in early 1999 except for the treatment <br /> of petroleum contaminated soils (PCS) at the site. PCS are presently being treated during summer months. <br /> The tops of the Cliff Dweller and King Solomon mine spoils piles were topsoiled and seeded in the spring- <br /> of 2001 because vegetation did not get established in these areas. <br /> Umetco recently applied for release of the mine ventilation raises, access roads, and portions of the mine <br /> spoils piles. <br /> A site map is not enclosed because there have been no significant changes since the last map was sent to the <br /> DMG. <br /> Construction activities planned for next year include the continued treatment of PCS. Umetco will <br /> continue to monitor the sites for stabilization and vegetative growth in anticipation of permit termination. <br />