My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-08-24_REPORT - M1977296
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1977296
>
2001-08-24_REPORT - M1977296
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2025 10:32:38 AM
Creation date
11/26/2007 9:57:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977296
IBM Index Class Name
Report
Doc Date
8/24/2001
Doc Name
ANNUAL REPORT & FEE FOR THE KING SOLOMON MINE GROUP
From
UMETCO MINERALS CORP
To
DMG
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
w <br /> King Solomon - Dolores Bench Annual Report 2000-2001 <br /> Reclamation construction at the King Solomon mines was conducted in early 1999 except for the treatment <br /> of petroleum contaminated soils (PCS) at the site. PCS are presently being treated during summer months. <br /> The tops of the Cliff Dweller and King Solomon mine spoils piles were topsoiled and seeded in the spring- <br /> of 2001 because vegetation did not get established in these areas. <br /> Umetco recently applied for release of the mine ventilation raises, access roads, and portions of the mine <br /> spoils piles. <br /> A site map is not enclosed because there have been no significant changes since the last map was sent to the <br /> DMG. <br /> Construction activities planned for next year include the continued treatment of PCS. Umetco will <br /> continue to monitor the sites for stabilization and vegetative growth in anticipation of permit termination. <br />
The URL can be used to link to this page
Your browser does not support the video tag.