Laserfiche WebLink
both parcels. ?he areas scheduled to be mined dicing 1994 are not sign;fic~ntly <br />• different fran areas previously mined in terms of topography, geology, or mining <br />te~3uLique and should not, therefore, erdtibit significantly different subsidence <br />effects. Panels Z and 1st North Fast will entail mining under deeper than usual <br />Dover in their northes~rmnst development and subsidence effects are therefore <br />anticipated to be less evident at the surface in these areas. <br />Ptrojected 8ubeide~c~e Monitoring 1994 <br />Per the conditions of technical revision 16, OOVOC is requited to inform the <br />Division of selecked sites propoeed for surveying for the upocmirg year in the <br />Annual Subsidence Report. For the 1994 calendar year, ~VOC proposes the <br />following fourteen (14) sites for surveying (see Map No. 2-5 appended to this <br />report): 6, 14, 15, 16, acrd 95; drill hole locations 55, 65, 66, and 68; <br />structure locations in the north ; of Section 10 denoted subsidence monitoring <br />points 94, 96, 97, and 98; and the corner of Sections 9, 10, 15, and 16 <br />designated point 99. 'Il1e terrain arri vegetation cover in the west pod area <br />con~Liine to make establishment of additional grid sites prohibitive. Alternative <br />locations with established access will provide sufficient data. <br />In addition, OOVCC also proposes to survey the seven (7) Pitkin Mesa Pipeline <br />monitoring locations as r~~; ed. <br />~J <br />C~ <br />7 <br />