Laserfiche WebLink
QUARTERLY REPORT FOR OAKRIDGE ENERGY PERMIT <br />MAINTENANCE ITEMS NOTED <br />1. Dump truck loads of fill on the upper end of the fill pile should be spread, rolled, <br />compacted and tested, similar to the rest of the fill pile. <br />2. The flatter portions of the main drain ditches should be checked for siltation. Any <br />excess siltation should be removed and the ditch returned to its design trapewid. <br />Some small erosion rivulets have formed on the top of the fill pile, especially where <br />equipment ruts were left. These should be bladed out and, if necessary, recompacted. <br />NOTE: These items should be attended to as part of the Cazbon Junction <br />rechannelizationvuork. <br />