Laserfiche WebLink
EASTSIDE MINE <br />Summary of 1993 Water Monitoring <br />Extent of Mining <br />Limited mining was accomplished in 1993. The entries of the <br />Eastside Mine are advanced to a total of 1200 feet. Three entries <br />are being driven on the strike. <br />Flow and Field Parameters <br />The flow and field parameters of the Harvey Gap Outlet above and <br />below the mine continue to demonstrate the seasonal discharges from <br />the Harvey Gap Reservoir. No significant deviations from the 1925- <br />1992 data are noted. <br />At the concrete structure, the sampling point for field and <br />chemical parameters in the Harvey Gap Outlet-Below Mine, there were <br />no flows during January and December. The ice was so thick t},at no <br />sample was taken. <br />At Cite flow sampling points on the East and West Laterals cf the <br />Harvey Gap viitlet-Below [dine, there was no flow in January and <br />December. <br />Chemical Parameters <br />The chemical parameter results of the Harvey Gap Outlet above the <br />mine and below the mine generally fall within the ranges <br />established 1955-1991. The conductivity, pH, alkalinity, dissolved <br />solids, SAn, cations, magnesium, sodium, bicarbonate, and sulfate <br />compare favorably with the established ranges for the nine y:ar~ of <br />sampling. The values L-elow the mine for 1993 are well witl~,in the <br />established levels for nH, conductivity, sodium and sulfate. There <br />appears to be seasonal variations; lower values during tl~e warm <br />months and Higher values during the cold months. The fluctuations <br />could be due to the ruing water level of the reservoir after t11e <br />water level was drained to base level during the irrigation <br />seasons. <br />The 1993 mine water discharge results are Suite similar to those <br />for 1907-1992. ibis could be expected due to tl-~e :ninrmai <br />advancernent of the entries. <br />impacts on Surface and Orounu water <br />J <br />