My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP01117
DRMS
>
Back File Migration
>
Report
>
REP01117
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:31:03 PM
Creation date
11/26/2007 9:53:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981047
IBM Index Class Name
Report
Doc Date
2/15/1989
Doc Name
COLLECTION DITCH DESIGN PN C-81-047
From
BLUE RIBBON COAL CO
To
MLRD
Permit Index Doc Type
STABILITY REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III IIIIIIIIIIIII III <br />blue <br />ribbon <br />coal <br />company <br />Matthew S. Hayes <br />Mined Land Reclamation Division <br />215 Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203-2273 <br />blue ribbon coal company <br />p.o. box 1352 <br />palisade, Colorado 81526 <br />(303)464-7951 <br />February 13, 1989 <br />~•~ <br />~. r '; `~ , <br />1' r <br />FEg ~ ~'~98g <br />, <br />i .. _~ <br />1. .~-.- ,~, , <br />n" <br />-..l ;o~,..~, <br />i _~s- <br />Re: Collection Ditch Design <br />Permit C-81-047 <br />Dear Mr. Hayes: <br />In a letter to Blue Ribbon from the Division dated January 11, <br />1989, the Division informed Blue Ribbon it must update its design <br />of the collection ditch along the northern side and base of the <br />mine bench to handle the 100 year storm event. <br />Blue Ribbon reclaimed its mine and mine bench during 1985 and <br />1986. There is a good chance that in accordance with Rule <br />4.05.2, Blue Ribbon will be allowed cease maintaining its sedi- <br />ment ponds and collection ditches during 1989. In order to ob- <br />tain approval to stop maintaining the sedimentation pond and col- <br />lection ditches, s vegetation success study must be performed. <br />It is Blue Ribbon's intent to have this study done during 1989. <br />Blue Ribbon therefore requests that the deadline to update its <br />design of the collection ditches along the northern side and base <br />of the mine bench be extended until September 30, 1989 to allow <br />time to perform and analyze the results of a vegetation study. <br />Sincerely, <br />~~~~~ <br />Jim Stover, P.E. <br />Chief Engineer <br />
The URL can be used to link to this page
Your browser does not support the video tag.