My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP00977
DRMS
>
Back File Migration
>
Report
>
REP00977
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:29:58 PM
Creation date
11/26/2007 9:49:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981025
IBM Index Class Name
Report
Doc Date
8/10/1983
Doc Name
REFUSE PILE CERTIFICATION FOR SECOND QTR 1983
From
SNOWMASS COAL CO
To
MLR
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. - --. _ <br />'~~~~~~ <br />rllr 10 1983 <br />N <br />Cc <br />REFUSE DISPOSAL SITE CHEC}: SHEET <br />~iJEB LAND RECLAMATION <br />lo. Dept. of Natural Resource <br />1 T ~ COPiM ENTS <br />1. Coal refuse de osited in 24" lavers X T m orar files over 24" <br /> Hfgh values due t0 high <br />2. Each laver is compacted to at least percent of rock from shear zone <br />90% maximum dr~• densit X <br /> Installed along inside of road, <br />3. t'-Ditch D-9 installed permanent installation to be <br />a. slope % made after new refuse access <br />__ <br />b. Ditch lining ?•laterial X _ road installed - --- <br />4. v-Dicch D-l0 installed. Temporarily disturbed <br />a. Slope % X to remove topsoil stockpile <br />b. Ditch lining material <br />5. Height of refuse material since last <br />bench (If 40' CONSTRUCT BENCH!) 10-11" ft. X <br /> <br />6. Bench being constructed. X <br />7. Refuse material outslope is 24° or <br />1V : 2'i H Ptaximun X <br />8. Bench width is 20 feet X <br /> TO be corrected d5 topS011 1S <br />9. Bench slope is back towards refuse pile a[ moved ih summer of 83 <br />1\': 20 H *finimum. X <br />10. Benches are pitched towards either side to <br />divert runoff to ditch D-9 or. D-10. X <br />11. Completed outslopes and benches are covered <br />with at least 4' of nontoxic, noncombustible <br />material includin an ade uate to soil laver. X <br />12. Evidence of an~• structural defects.* * If yes see co~moents below <br />13. Topsoil from previously undisturbed areas <br />bein salva ed ade uately. <br />14. Trash and other debris being separted <br />from coal refuse. <br />15. Additional comments or observations 1.) Topsoil being moved •from toe of disposal <br />to a location above, the disposal area. <br />2.) Little refuse added due to slow coal market <br />I hereby certify that the inspection of the refuse disposal area was done under m}• <br />direct supervision and is constructed as per the current Colorado Mined Land Reclamation <br />Permit requirements. <br />Date <br />Signature <br />Larr M. Reschke P.E. 19691 <br />~-- -- <br />
The URL can be used to link to this page
Your browser does not support the video tag.