Laserfiche WebLink
• Reclamation Costs - C-CM-25 Mi• <br />3/12/99 -Page 2 <br /> Present <br />Costs Permitted <br />Future Costs Future Costs <br />Non DMG <br />Gasoline and diesel fuel 300 200 250 <br /> <br />Mobilization and Demobilization <br />$90/hr. 8 hrs. 720 720 720 <br /> <br />Sho /D Removal <br />65 hrs. $23.50 1530 <br />Materials 200 <br />Break u concrete pad 4 hrs $50/hr. 200 <br /> <br />Com ressor Building <br />16 hrs $23.50/hr. 376 <br />Materials 100 <br />Breaku concrete pad 2 hrs $50lhr. 100 <br /> <br />Engineering costs for closure $30/hr 240 240 <br /> <br />DMG Technical Revision $22.50/hr. 180 180 <br /> <br /> <br />Total Costs 7,303 4,131 3,075 <br />RECCM25.XLS - Sheetl -Page 2 <br />