Laserfiche WebLink
iiiiiiiiiiiiiiiiiii~ <br />999 <br />ENGINEERING & SURVEYING, INC. <br />October 30, 1998 <br />555 SOUTH CAMINO DEL RIO <br />BODO PROFESSIONAL CENTER • UNIT A-1 <br />POST OFFICE BOX 97 <br />DU RANGO. COLORADO 8 1 302-009 7 <br />TELEPHONE 9 70 24 7- 1 705 <br />FAX 970-247-1710 <br />CONSULTING CIVIL AND SANITARY ENGINEERING <br />LAND, UTILITY AND CONSTRUCTION SURVEYS <br />RECEIVED <br />Harry Bonney <br />Colorado Division of Minerals & Geology <br />] 313 Sherman Street -Room 215 <br />Denver, Colorado 80203 <br />NOV 06 1998 <br />.. ., LiS" a (sEl'f"3i <br />RE: CARBON JUNCTION MINE; NO. C-92-080; THIRD QUARTER REPORT, 1998 <br />Dear Mr. Bonney: <br />During the previous quarter (through September 30, 1998) the rough earthwork was <br />mostly completed on the Cazbo^ Junction rechannelization within Cazbon Junction Canyon as <br />shown on Map 5-10. Specifically, reshaping of the fill pile and cutting the channel have been <br />completed. Some topsoil capping work has begun. <br />Three of the items which remain from my last (7-23-98) report still need attention (see <br />attached). <br />This constitutes my report for the period mentioned. <br />Very truly <br />Harry L. <br />cc: 1) Jim Hendricks <br />2) Mike Savage <br />~LV :e <br />