Laserfiche WebLink
<br />h.0 OPERATlONAND MAINTENANCE <br /> <br />If preferred by SWPC, G[tM shall provide monthly operation and maintenance <br />inspections of the DPE system. The inspections shall assess the current operating status <br />of the system, record pertinent operating parameters, and provide recommendations to <br />SWPC of any repairs or maintenance required for the system. An annual letter report <br />shall be completed by ERM for SWPC, and shall summarize the performance of the <br />system for the preceding years operation. <br />Daily monitoring of the system shall be performed by SWPC, and shall include the <br />following: <br />• Monitoring ofvacuum pressure in the blower manifold, contacting ERM when out of <br />specified operating range; <br />• Monitoring levels of separated product discharged to drums, and appropriate <br />disposal/recycle; <br />• Monitoring levels of separated and treated ground wafer discharged to the water <br />holding tank, and appropriate removal; <br />• Notifying ERM of any observations or concerns regarding pcrfonuancc or operation <br />of the system. <br />ERM-Rocky Mountain, Inc. t4 Printed on Recycled Paper <br />P:\ 1000\SWPC\961019. I \llesign. Doc <br />