Laserfiche WebLink
<br />INDEX <br />Annual Hydrologic Report with Mine Inflow Map <br />1983 - Submitted May 31, 1984 <br />C <br />1984 - Submitted July 18, 1985 <br />1985 - Submitted February 12, 1986 <br />1986 - Submitted January 21, 1987 <br />Hydrologic Monitoring Data <br />Ground Water <br />Mine Water <br />Surface Water <br />Monitoring Reporting Format <br />TYPE OF PAGE <br />MON'TORING CODE SAMPLE SITE SITE DESCRIPTION <br />Ground Water GA-q Well Well located near the NE corner of <br /> #1 Pond. Sample taken in the office, <br /> therefore, temperature is not rep- <br /> resentative of ground water. <br />GB-# Bench Piezometers Piezometers placed in mine bench <br /> TB-1 thru TB-8 during stability analysis in 1984 <br /> (see appendix 1-B to Blue Ribbon <br />C Coal Company Technical Revision <br /> Request - Mine Bench Stabilization). <br />GC-# Bench Piezometers Same as GB-# site description. <br /> TB-9 and TB-10 <br />GD-# Bench Underdrains leachate flowing from the 3 Under- <br /> drains in the restabilized mine <br /> bench. <br />GE-# Bench Underdrains - Same as GD-# site description <br />Quality <br />GF-# Bench Piezometers ~ P-1 through P-4 installed in the re- <br />established mine bench in June and <br />November 1985. See 1985 Annual <br />Hydrologic Report for further infor- <br />mation. <br />Mine Water MA-# Mine Water Taken at discharge into #1 Pond flow <br />calculated from the previous month's <br />meter reading. Changed to direct <br />discharge to Hubbard Creek, NPDES <br />004, 10/9/85. Flow now stated as <br />pumping rate. Meter reading at <br />bottom of page. <br />