Laserfiche WebLink
NORTHWEST COLORADO CONSULTANTS, INC. <br />Project: Refuse Pile <br />Location: Foidel Creek Mine <br />Client: Twentymile Coal Co. <br />Project No.: 99-3983 <br />Report No.: 17 <br />Date: 5(26/04 <br />Time: 3.0 <br />Mileage: 44 <br />Engr.fTech: CR <br />Work Performed: <br />As requested, we visited the project site on this date and conducted nuclear density re-test No.'s 263A and 269A <br />on the material that was reworked in waste coal piles 2 and 2 %:. <br />Twentymile Coal Company crews had placed and compacted processed Waste Coal in Areas 2 and 2 %:. On our <br />previous site visit, two of the tests taken had not met the required level of compaction and the contractor was <br />notified of these locations so that the material could be recompacted. <br />We obtained a moisture content sample at the two re-test locations. <br />Remarks: <br />The material tested generally met the project specifications for compaction. <br />Verbal Discussions: <br />Dave Wallace of Twentymile Coal Co. was notified of today's test results. <br />