Laserfiche WebLink
Bowie Resources, LLC <br />Bowie No. 2 Mine <br />2004 Annual Hydrology Report <br />Surface Water <br />Initiated 6/12/1995 6/12/1995 6/1211995 6/12/1995 <br />Adivated 3130/1997 3/30/1997 3/30/1997 3/30!7997 <br />Date 11/162004 9/282004 6/23/2004 4/1/2004 <br />I • <br />I (NITS <br />Min <br />S-1 <br />B Gulch • Spring 1 <br />Elevation - 6990 <br />Summary Information <br />Baseline Operation <br />Ava Max Min Ave Max <br />Fbw GPM 0.00 0.38 7.25 0.00 0.05 0.75 0 0 0 0 <br />FieldCommenl Dry Dry Dry Dry <br />ph su 8.4 8.6 8.7 8.1 8.3 8.5 <br />Conduc8vity umhos/an 1520 2053 2300 2000 2067 2200 <br />Temperature Celsius 2.4 10.5 17.1 12.8 77.2 20.1 <br />The S-1 monitoring point bcadon is along the Stevens Draw road where it crosses 8 Gulch. This spring Is boated on the upper side o/ <br />the road, discharges along the road and eventually contributes its flow Nrough Sediment Pond 8. <br />Baseline Information for Paint 5-1 is dedved from events beginning on 6/72/95 through 3/30/97. <br />Point influenced by mining on 3/20(97. <br />Figure No. 7 <br />