<br />TR-019 Fuel-Oil Tank Farm Relocation <br />In August, BMRI submitted a technical revision for the <br />relocation of the fuel-oil tank farm. The new location is <br />bermed and fully lined and provides easier access. <br />Relocation was completed in November. <br />TR-020 Process Water Tank Storacxe Area <br />In August, BMRI submitted a technical revision for the <br />addition of a concrete storage area around the procesis water <br />tank. Construction was completed in November. <br />Reclamation Activities <br />The following is a description of reclamation activities for <br />1994. (See attached map.) <br />Construction of Waste Rock D was nearly completed. <br />Reclamation of the ESI heap leach area was initiated with <br />the removal of spent ore, the regrading of the pad, aind <br />spreading of the topsoil for spring seeding. 500 pinoin <br />seedlings were planted at the East Pit. The second lift of <br />Waste Rock D, the north outslope of South Waste Rock Area, <br />and the main embankment raise were broadcast seeded with the <br />following mix: <br />Species <br />Western Wheatgrass <br />Slender Wheatgrass <br />Blue Grama <br />Indian Ricegrass <br />Mountain Muhly <br />Spike Muhly <br />Mountain Mahogany <br />Winterfat <br />pls lbs/acre <br />4 <br />3 <br />2 <br />2 <br />1 <br />1.05 <br />0.5 <br />0.5 <br />Mountain Brome and Cicer Milkvetch were not available. <br />Slender Wheatgrass and Spike Muhly were used in their place. <br />Areas of Disturbance <br />The following is a summary of the areas of disturbance at <br />the San Luis Project: <br /> Permitted Actual Under <br />Area Disturbance Disturbance Reclamation <br />East Pit 20 acres 20 acres 20 acres <br />West Pit 110 100 34 <br />Waste Rock A 19 0 0 <br />Waste Rock B 18 18 15 <br />Waste Rock C 30 28 28 <br />