Laserfiche WebLink
II <br />The report titled "San Luis Mine Phase II, Raise 2 Construction Report" and the associated <br />drawing has been prepared by Steffen Robertson and Kirsten (U.S.) Inc. under the direct <br />supervision of David S. Hallman, Colorado Professiottal Engineer No. 26076. The associated <br />construction work has been reviewed by same and found to be in compliance with the design <br />drawings and specifications. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />1 <br /> <br />1 <br /> <br /> <br /> <br /> <br />David S. Hallman <br />Colorado P.E. No. 26076 <br />L <br />