Laserfiche WebLink
1 <br />' S.0 CONCLUSIONS <br />The extensive QA/QC program implemented throughout construction of the Phase II Raise 2 fill <br />has ensured that the structure meets or exceeds the design requirements. The design fum, SRK, <br />' was involved throughout the construction activities and the QA/QC program, and the Engineer <br />of Record has verified that the structure constructed during this raise meet the°~ intent of the <br />' design through issue of this report. <br />r~ <br /> <br /> <br /> <br />1 <br /> <br />1 <br /> <br /> <br /> <br /> <br /> <br />1 <br />8 <br /> <br />