My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP00355
DRMS
>
Back File Migration
>
Report
>
REP00355
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:29:16 PM
Creation date
11/26/2007 9:38:34 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985003
IBM Index Class Name
Report
Doc Date
3/23/1998
Doc Name
NOTICE OF INTENT TO CONTINUE MINING OPERATIONS 112C CONSTRUCTION MATERIALS ANNUAL REPORT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />III III III III IIII III <br />Notice of intenC to Continue Mining Operations <br />1'_2c construction Materials annual R.DOrt <br />' R« z s~z <br />RECEfVED <br />MAR 2 3 1998 <br />Pert¢ictae Name: <br />Permit No. <br />Operation Name: <br />Anniversary Data: <br />Total: <br />1. a. Permitted acreage: <br />2. <br />3- <br />4. <br />5. <br />6. <br />7. <br />8. <br />9. <br />10 <br />11 <br />Running Creek Ranch <br />M-es-oo3 ~ Div~sion of MineralsB GeolDgy <br />Freund Pit• <br />April 22, 1999 '~ <br />$550.00 fDUe on your Anniversary Dace) <br />9.9 b• County where mine is 1oc~ted: ~~/'~ <br />Hae this mine been granted TEMPORARY CESSATION STATU57 <br />Dose this mine operate MORE or LESS than 190 days Her Year? <br />Does this mine have a phased reclamation plan? <br />Total aerea affected during the report year:• <br />Total acres reclaimed for the report year:+ <br />Total number of acres is topsoil replacement stage: <br />a. Average thickness of topsoil replaced: <br />Total number of aorea seeded: <br />a. Liec species seeded ~ seedin4 rate for report year on back <br />For non-phased operations provide dates extraction ceased: <br />a. Dace reclamation began: <br />The type and approximate quantity of fertilizers, organic sate <br />conditioners used for the report year;* <br />YES NO <br />MO ESS <br />YES NO <br />Z <br />-~" <br /> <br />or soil <br />Estimated total acres to be affected Sn the next report year:` <br />COt6MENTS <br />* Please show the location of the acreago for items 9 - 6 on your +*, Indicate <br />the phases of the reclamatien which have been conplacad, correlated with our timetable. <br />For phased operations show dates extraction ceased and dates reclamation ~egan. <br />•* IDOTE: If there have not been any changes since the last annual rep <br />previously submitted a map which correctly depicts the current acreage <br />6, then a new m is unnecessary. However, this must be stated above. <br />signature: Dace: 3 -~8 _y <br />Please t or p ntc~urrent contact namq, mailing address, and Phone <br />COIItact Name: ~ ~/"~~~ ~ ~~~ Phone: <br />COnmanY: /IG"//717//19 G/71e~ //a.,tcN <br />Aaareas: /Sl~GO E. B~a~i~t.lY-. <br />~}urnvu , ~~ 8a~// <br />and you <br />items z tluough <br />below: <br />'%- 9~ <br />Federal ,Tax ZD ~Ne. Or Social Security NO.: ~/ ~~~085~_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.