My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP00257
DRMS
>
Back File Migration
>
Report
>
REP00257
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:29:11 PM
Creation date
11/26/2007 9:36:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999002
IBM Index Class Name
Report
Doc Date
6/23/2003
Doc Name
Cavity Characterization Plan
From
American Soda LLP
To
DMG
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
December 23, 1999 Page I3-! <br />• APPENDIX B <br />STANDARD OPERATING PROCEDURE FOR WATER LEVEL MEASUREMENT <br />B.1 INTRODUCTION <br />The purpose of this document is to define the standard operating procedure (SOP) for <br />measuring water levels in wells at the American Soda, Yankee Gulch Sodium Lease. This document <br />describes the materials and procedures required, and serves as a supplement to the groundwater and <br />surface water monitoring plan. <br />The objective of measuring ("sounding") water levels is to determine the change, if any, in <br />water level elevation over time. Electronic water level sounders and dedicated pressure transducers <br />will be used, Water level measurement with an electronic sounder will be conducted as described <br />in this SOP. Water level measurement with a pressure transducer should be conducted in accordance <br />with the transducer manufacturer's operation and calibration instructions. <br />C~ <br />J <br />B.2 EQUIPMENT <br />Equipment needed to measure water levels may include: <br />Maps with well locations. <br />Well completion data. <br />~ Keys to protective well covers. <br />Electronic water level sounder. <br />~ Engineer's tape. <br />~ Decontamination equipment. <br />B.3 PREPARATION <br />The following actions are recommended before going to the field to sound water levels: <br />Test equipment prior to departing for field. Are the batteries fresh? Does the sensor <br />work when probe is immersed in water? <br />• <br />Agapito .Associates, Inc. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.