My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP00257
DRMS
>
Back File Migration
>
Report
>
REP00257
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:29:11 PM
Creation date
11/26/2007 9:36:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999002
IBM Index Class Name
Report
Doc Date
6/23/2003
Doc Name
Cavity Characterization Plan
From
American Soda LLP
To
DMG
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
December 23, 1999 <br />Piceance Site <br />PuPe 10 <br />During the baseline period, groundwater levels will be measured monthly for all <br />monitoring well completions. This will include wells located in and out of the 0-5 year mining <br />panel. <br />During the first 5 years of commercial operations, water levels will be measured monthly <br />for all monitoring wells completed in zones above the Dissolution Surface (including in-panel and <br />out-of--panel wells), and weekly for monitoring wells completed at the Dissolution Surface. The <br />weekly water-level measurements for Dissolution Surface monitoring wells will be performed <br />using suitable automated data recording equipment. The automated equipment will not be <br />installed until the beginning of commercial operations. <br />Parachute Site <br />Once the alluvial monitoring well is constructed at the Parachute Site, water level will be <br />measured on a monthly basis. Water-level monitoring will be conducted in accordance with the <br />procedures detailed in Appendix B. <br />• Domestic Welfs <br />Water levels will be measured in the available domestic wells contained in this Water <br />Monitoring Plan on a monthly basis, and will be performed in accordance with the procedures <br />detailed in Appendix B. <br />2.2.2 Groundwater Quality Monitoring <br />Groundwater quality will be monitored at the Piceance Site, the Parachute Site, and in <br />domestic water wells. This section includes details regarding water-quality parameters to be <br />measured in water samples, groundwater quality monitoring schedules, and groundwater <br />monitoring procedures. <br />Groundtirater Quality Parameters <br />The monitoring schedule allows for water quality samples to be analyzed for either the <br />standard list of parameters contained in WQI (Table 2) or the comprehensive list of parameters <br />contained in WQ2 (Table 3). [n general, water quality samples will be analyzed for the WQ2 <br />parameters on a less frequent basis that the WQ1 parameters. The two lists of parameters were <br />developed in consultation with the BLM, EPA, CDMG, USGS, Rio Blanco County, and American <br />• Soda. These parameters are generally in accordance with applicable water-quality parameters <br />listed in the Colorado Department of Public Health and Environment (CDPHE), Water Quality <br />Agapito Associates, [nc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.