Laserfiche WebLink
~ .~ <br />~. ` <br />that "flow measurements will be ideally taken twice a year if water is available to <br />sample...once during spring snow melt and once during a storm event." No samples were <br />taken from either Munger or McClane Creek during the 2001 or 2002 water years. Please <br />ensure that an operator representative who is on-site full time is assigned the responsibility <br />of collecting samples and flow measurements during at least one summer storm runoff <br />event and from snowmelt runoff at the Munger Creek and McClane Creek sampling sites. <br />2. To facilitate assessment of conformance with Probable Hydrologic Consequences <br />(PHC) projections in future AHR reports, a direct reference should be made within the AHR <br />to predictions of minewater inflow from the PHC section of the application (Appendix N, p. <br />2). Please include a narrative evaluation of conformance of observed inflow to PHC <br />projections contained in Appendix N. <br />Please contact me if you haven any questions. <br />Sincerely ~- ., <br />Daniel T. Mathews <br />Environmental Protection Specialist <br />C: Denver File <br />