Laserfiche WebLink
<br />DLD WASTE DISPOSAL PILE - <br />MONTH LOADS X 14.8 YD3 LOADS - YD3 TOTAL YD3 <br />March 1982 100 1480 1,48(1 <br />A ril 1982 50 740 2,220 <br />Ma 1982 40 592 2,812 <br />June 1982 60 888 3,700 <br />Jul 1982 61 902,8 4,602.8 <br />Aug. 1982 103 1524,4 6,127.2* <br />Se t. 1982 42 621,6 6,748.8 <br />Oct. 1982 21 310,8 7,059.6 <br />Nov. 1982 0 0 7,059.6 <br />Dec. 1982 143 2116.4 9,176.0 <br />Jan. 1983 288 4262.4 13,438.4 <br />Feb. 1983 13 1080.4 14,518.8 <br />March 1983 63 932.4 15,451.2 <br />A ril 1983 199 2,945.2 18,396.4 <br />May 1983 348 5150.4 23,546.8 <br />June 1983 200 2960 26,506.8 <br />,lul 1983 235 3478 29,984.8 <br />Au 1983 55 814 30,798.8 <br />Set. 1983 ---RECLAIMED- <br />Oct. 1983 <br />Nov. 1983 <br />Dec. 1983 <br />** - 2,592 <br />TOTAL 1986 28,206.8 <br />TDTAL 04/87 28,206.8 <br />*Sl1RVEYED 09/01/82 APPROXIMATELY 4200 YD3 <br />**Note: This is the amount of gob hauled from the Old Waste Disposal <br />Area to the Western Slope Carbon wash plant in 1986. <br />