Laserfiche WebLink
Colorado Division of Minerals and Geology <br />s~~l~.~rel~ <br />(mine name) <br />Annual Reclamation Report for the Year 20-0 ~ <br />(Permit #) <br />This report, required by Rule 2.04.13, is due by February 15 of each year, or other date, as agreed upon <br />by the Division. It should include text, discussion, and maps, at a minimum, in addition to any other <br />reclamation monitoring data as required by the approved permit The location of the acreage reported <br />under each land status cafegory and year of seeding (if applicable) should txx clearly and accurately <br />identified on a map included with the report <br />Permittee: G~~C Address: ~j <br /> <br />Land Status Cate o Last Years <br />Cumulative Total <br />This Calendar Year <br />CumulaWe Total ~ <br />Acres disturbed 9 ~. 5 ~ D = 97 s <br />Acres bac~lled and raded ~~ . ~ + I - y0.2. <br />Acres to soiled ~D.~ +- ~ = y0. <br />'(exdude aces where Phase III release has been achieved) <br />Seeding typically begins the minimum 10-year reclamation liability period. Please report the acres for <br />each sate o below. Do not include acres that have achieved final, Phase III release. <br /> Last Years <br /> Cumulative <br />Total Thls Calendar <br />ear Cumulative <br />Total' 10 years or <br />less Greater than <br />10 ears' <br />Acres seeded• 39. l + ~. D y0. ~ 3D . Pj 9.3 <br />•incude, if necessary, a description of any augmented seeding or cultural practices <br />For the Entire Life of Mine, the number of acres: <br />Phase 1 released ~~~ <br />Phase II released V <br />Phase III released <br />For Mines in Permanent Cessation: ~} <br />Total acreage in facilities subject to reclamation but yet to be completed ZJ r 2 <br />For Government Pertormance and Results Act / (~ <br />Acreage in long-term mining or reclamation facilities s ~ J • CJ <br />Acreage in active mining areas' <br />' Includes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion and <br />collector dkches, water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and construction areas; <br />office area, repair shops, and parking; coal stockpiles, loading, and processing areas; railroads; coal conveyors; refuse piles and <br />coal mine waste Impoundments; head-of•hollow fills; valley fills; ventilation shafts and entryways; and nonwal waste disposal area <br />(garbage dumps and coal combustion by-products disposal areas). <br />