Laserfiche WebLink
.._. <br />~- <br />• , iii iiiiiiiiiiiu ~~~ <br />June 18, 1981 <br />Mr. Earl Hale <br />7395 California Drive <br />Colorado Springs, Colorado 80908 <br />RE: Hale Pit - Our file ao. 81-121 <br />Dear Mr. Hale, <br />By way of confirming and clarifying our conversation of yesterday, I will <br />briefly recapitulate the answers to the questions in my letter of Juae 11, <br />1981 as you furnished them to me in our discussion. I will only mention items <br />that are not clearly answered 1n your letter of June 15, 1981. Unless you ad- <br />vise ma otherwise, we will consider these anewera ae part of your permit. <br />Exhibit A <br />The legal description of the affected land ie the SIi~ $W~, Section 24, T12$, <br />R63W of the 6th P.M. <br />Exhibits B and C <br />1. Your map seems to indicate the general topsoil stockpile location. <br />If the stockpile eatenda some distance beyond the sQuare western boundary, <br />the nor~Harn permit boundary is to be moved southward to compensate. <br />As I understand it, the permit area is to be wrked in stripe that are <br />mined west to east, with topsoil from a newly opened strip to ba placed <br />on the previously mined strip to the south for purposes of reclamation. <br />This will thus necessitate only one topsoil stockpile to be maintained <br />in the southeast corner of the permit area. <br />2. Thera will be no fined equipment oa the site. <br />3. Theze is one adjacent landower to the south, and he has been notified. <br />4. There are to be no new haul roads constructed off of the permitted area. <br />5. The wrking faces of the mining operation will be 2H:1V or lase. <br />Exhibit D <br />1. I have accepted the wildlife section of your application as given. <br />2 2. Water will not be required for this operation, and the creek bed ie too <br />far away for sedimentation to be a problem. <br />3. The Soil Conservation Service, ae I understand it, is being consulted <br />in relation to this operation. Their report should cover the ezietiag <br />vegetation on the site ae well as recommendations for a reclamation <br />plan (topeoiling, seed min, mulching, etc.). If I do not receive this <br />report before the Juae 25th meeting, I will plan to stipulate the permit <br />to the effect that it will be submitted within a short time. <br />