<br /> <br />RECLAMATION OF THE SWEDE CORNERS PIT <br />Owner-U.S.D.I. Bureau of Land Management <br />Operator-Southway Construction Co. Inc. <br />Alamosa, Colorado <br />RECLAMATION RECOMMENDATIONS <br />STOCKPILES <br />Surface (topsoil) and subsurface (subsoil) materials must be <br />saved and stockpiled separately during the mining process if <br />reclamation is to be accomplished. <br />The soils of this site are dominated by the Garita-Platoro <br />complex, 1 to 9 percent slope. A copy of the soils map and <br />soils descriptions are included with this report. <br />The surface soil that is very important to the reclamation <br />process is approximately 9 inches deep in the Garita soil <br />and up to 21 inches deep in the Platoro soil. The Garita <br />soil has a visible calcium carbonate layer at approximately <br />9 inches. This limy profile should not be mixed with the top <br />soil and should be used as the separation zone between the <br />topsoil and the subsoil where it exists. In the absence of <br />this limy layer, the top soil should be removed to a depth <br />of 16 inches and stockpiled separate from subsoil material. <br />The subsoil material removed and stockpiled should be of <br />sufficient quantity to provide a uniform thickness of <br />topsoil and subsoil of at least 18 inches over the entire <br />disturbed area for the reclamation process. <br />Two major stockpiles will be necessary to maintain the <br />separation of soil materials to be used for reclamation <br />(topsoil separate from subsoil). The topsoil (surface <br />material) from both soil types can be mixed as can the <br />subsurface materials of both soil types. <br />The stockpiles must be located far enough from the mine pit <br />so as not to be disturbed during gravel excavation.The size <br />and shape of these piles will be determined by the equipment <br />used to accumulate and pile the soil materials. <br />The volume of stockpiled material shall be adequate to apply <br />a layer of soil material to a minimum thickness of 18 inches <br />of which 8 inches will be topsoil. The stockpiles must be <br />stabilized with the same mix that is recommended for the <br />reclamation seeding at least once a year in late June or <br />late October. Seeded stockpiles will be maintained until <br />used for reclamation without adding material or disturbing <br />with heavy equipment. <br />