Laserfiche WebLink
• TEMPORARI' EROSION CONTROL STILLING BASIN <br />FIGURE A-2 <br />LENGTH AND WIDTH VARIABLE 70 flT <br />SITE REOUtREMENTS , ~ <br />• LINE BOTTOM ANO SIDES <br /> WITH CAUSMED STONE. <br /> STONE TO REMAIN IN <br /> (LACE AFTER COHST RUCTION. <br /> BASIN 70 BE MAINTAINED <br /> WRING THE CONSTRUtt10N <br /> -ERIOD. <br /> <br />S <br />11 <br />~1 / HEADWALL ANO PIPE <br />-FLOW <br />1~ <br />~`" <br />\ ROCK FILL RIP RAP DH <br />CRUSHED STONE <br />RIP RAP TO REMAIN IN PLACE <br />AFTEA CONSTRUCTION. <br />A-12 <br />