My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE139708
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE139708
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:42:50 PM
Creation date
11/26/2007 8:54:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
EXHIBIT 42b EXHIBIT 19 AQUIFER TEST DATA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• EXHIBIT 19 <br />. AQUIFER TEST DATA <br />Aquifer characteristics have been determined at several locations in <br />the permit area by pump tests. The aquifer tests were conducted by sev- <br />eral private and government agencies. Data collected in the tests are <br />presented in this Exhibit as Table 1, Aquifer Characteristics. <br />Four aquifer tests have been conducted in the permit area to date. <br />These include tests of the following aquifers: 1) the Foidel Creek al- <br /> luvium at well OB-FM-6 by the U.S. Geologic Survey; 2) the overburden <br /> above [he Wadge seam at well OS-FM-S by the U.S. Geologic Survey; 3) the <br /> Wadge seam and overburden at Well 08-77-58 by Amuedo and Ivey, consultant <br /> <br /> geologists; and 4) the Wadge seam and overburden at Well 08-79-6 by <br />• Colorado Yampa Coal Company. <br />The first test, performed by the U.S. Geologic Survey on October 15, <br />1975, was a drawdown test of the alluvium of Foidel Creek. According to <br />the log of well FM-6 presented in Exhibit 1, Drill Hole Logs, the allu- <br />vium produces water from a layer of sand and gravel from 15 to 20 feet. <br />Drawdown was measured during a constant pumping rate of 6.3 gallons per <br />minute. Drawdown vs. time is plotted in Figure 1,.We11 OS-FM-6, of this <br />exhibit. Transmissivity was computed using the straight-line method of <br />Stallman (Lohman, 1972), equalling 108.7 gpd/ft. Permeability was com- <br />puted by dividing the transmissivity by the saturated thickness, equal- <br />ling 21.7 gpd/ft2. These values are believed to be representative of the <br />alluvial sand and gravel deposits in the permit area. <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.