My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE139674
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE139674
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:42:49 PM
Creation date
11/26/2007 8:51:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
Exhibit 51 Appendix C
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Permit No. 386026 <br />Coordinate construction work with L. C. Neal at 527-4947.' <br />Driveway shall be constructed 35 feet wide with 50 foot radii. <br />Surfacing for driveway approach is required as follows: 12" of class <br />1 gravel in 1, 12" lifts;6" of class 6 gravel in 1, b" lifts and 3" of HBP in 2, <br />1.50" lifts of grade E, EX, or equivalent. The asphalt cement in the HBP shall <br />be AC (10). <br />Fill/cut slopes shall be at a 3:1 slope on the roadway and at 6:1 on the <br />access approach. <br />It is the responsibility of the property owner to prevent all livestock from <br />entering the State Highway right-of-way. Any livestock that does enter the <br />Highway right-of-way is the responsibility of the property owner. <br />This approach shall not. be used until existing is closed. <br />A new 24" C+ip culvert shall be used. <br />All culverts (side drains) installed in ooen ditches shall have <br />flared end sections. <br />' No drainage from this site shall enter onto the surface of the highway. '. <br />All existing drainage structures shall be extended to accommodate all new <br />`-"construction and safety standards. <br />Contractor shall follow the applicable construction specifications set for by <br />the Department of Highways in the, latest manual Standard Specifications for Road <br />and Bridge Construction. ~- <br />Owner is responsible for any utilities disrupted by the construction of this <br />driveway and ell expenses incurred for repair. <br />Any damage to any existing Highway facilities shall be repaired prior to <br />'continuing other work. <br />Compaction of sub-grade, embankments and bnclcfill shall comply with Section <br />203.11 of the Division of Highways Standard Specifications. ' <br />Compaction of Hot Bituminous Pavement (HBP) shell comply with Section 401.17 of <br />the division of Highways Standard Specifications. <br />If frost is present in the sub-grade, no surfacing material shell be placed <br />until all frost is gone or removed. <br />Saa or score asphalt to assure a straight edge for patching. <br />The first 20 feet beyond the closest highway lane, including speed change lanes, <br />shall slope down and away from the highway at a 2.: grade to ensure proper <br />drainage control. <br />All excavations on Utility lines, culverts, other trenches or tunnels shall meet <br />_:the requirements of COLORADO DEPARTMENT OF HIGHWAYS, OSHA, Colorado Industrial <br />Co®ission and the Colorado Division of Mines whichever applies. <br />She area around the new work shall be well graded to drain, tap soiled, <br />fertilized, mulched and reseeded. <br />;Work shall BEGlct AFTER 8:30 A.M. and all equipment shall be off the roadway <br />BEFORE 3:30 P.M. each day. <br />
The URL can be used to link to this page
Your browser does not support the video tag.