My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE139671
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE139671
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:42:49 PM
Creation date
11/26/2007 8:51:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999050
IBM Index Class Name
Permit File
Doc Date
10/19/1999
Doc Name
M-99-050 TIMNATH CONNELL PIT APPROVAL OF A 112 PERMIT APPLICATION
From
DMG
To
CONNELL RESOURCES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />-~- <br />3. The total amount of financial warranty required for permit issuance is set at <br />5510.193.00. Upon the submittal and approval by the Division of a Technical Revision which <br />includes a set of standards and specifications and a quality assurance plan for the lining of the pit <br />the tnancial warranty will be recalculated. <br />4. The Operator shall mine and backfill the northeast corner of the permit area prior <br />to mining activities in Phase 4. The crest of the backfill must be at least as high as the adjacent <br />undisturbed areas and must be at least 400 feet from the crest of the bank at bank full stage of the <br />Cache La Poudre River. <br />5. The Operator shall develop, in consultation with Mr. Swift, a contingency plan for <br />assuring delivery of water to Mr. Swift, and shall submit the plan to the Division within 90 days <br />of the effective date of this Order. The Division shall have 60 days to review the plan and decide <br />on the plan's sufficiency. <br />6. The Operator shall submit to the Division revised plan maps showing the location <br />of the intended settlement ponds. <br />7. The Operator shall revise the monitoring plan to include the four piezometers on <br />Mr. Swift's property. <br />1 <br />Dated this day of ©~- , 1999 <br />COLORADO MINED LAND RECLAMATION BOARD <br />DEPARTMENT OF NATURAL RESOURCES <br />FOR THE BOARD <br />BY: <br />MICHAEL B. L t~IG, <br />Division of Minerals and ~y <br />M.bss\PM1I\I\Bnard ONrrslSeP~rmber994n99-050 crs do. <br />
The URL can be used to link to this page
Your browser does not support the video tag.