Laserfiche WebLink
<br />-~- <br />3. The total amount of financial warranty required for permit issuance is set at <br />5510.193.00. Upon the submittal and approval by the Division of a Technical Revision which <br />includes a set of standards and specifications and a quality assurance plan for the lining of the pit <br />the tnancial warranty will be recalculated. <br />4. The Operator shall mine and backfill the northeast corner of the permit area prior <br />to mining activities in Phase 4. The crest of the backfill must be at least as high as the adjacent <br />undisturbed areas and must be at least 400 feet from the crest of the bank at bank full stage of the <br />Cache La Poudre River. <br />5. The Operator shall develop, in consultation with Mr. Swift, a contingency plan for <br />assuring delivery of water to Mr. Swift, and shall submit the plan to the Division within 90 days <br />of the effective date of this Order. The Division shall have 60 days to review the plan and decide <br />on the plan's sufficiency. <br />6. The Operator shall submit to the Division revised plan maps showing the location <br />of the intended settlement ponds. <br />7. The Operator shall revise the monitoring plan to include the four piezometers on <br />Mr. Swift's property. <br />1 <br />Dated this day of ©~- , 1999 <br />COLORADO MINED LAND RECLAMATION BOARD <br />DEPARTMENT OF NATURAL RESOURCES <br />FOR THE BOARD <br />BY: <br />MICHAEL B. L t~IG, <br />Division of Minerals and ~y <br />M.bss\PM1I\I\Bnard ONrrslSeP~rmber994n99-050 crs do. <br />